// CASE STUDY // COMMERCIAL

Hyperscale Datacenter Solar Park

Hyperscale Datacenter Solar Park
// PROJECT SHOWCASE

Hyperscale Datacenter Solar Park

Direct PPA solar supply with zero-emissions power certification for artificial intelligence compute clusters.

01. The Engineering Challenge

The site presented severe topographical and environmental hurdles, including high seasonal wind shear, extreme ambient temperature variations, and strict wildlife migration corridor buffer requirements. The regional grid operator mandated a zero-curtailment tolerance during peak solar midday generation.

02. The Enervox EPC Solution

Enervox deployed customized bifacial TOPCon photovoltaic trackers coupled with intelligent sub-second pitch-regulated direct-drive turbines. An integrated containerized lithium-iron-phosphate (LFP) BESS absorbs mid-day power surges and feeds synthetic inertia into the high-voltage substation.

03. Measured Environmental & Economic Impact

Since commissioning in 2025, the installation has operated at a verified 99.85% availability factor. Over 480,000 metric tons of CO2 emissions are avoided annually, displacing local fossil peaker generators and stabilizing the regional transmission loop.

75 MWInstalled Rating
99.8%Annual Uptime
480kTons CO2 Avoided